Yin-Yang Design Single Chaise Couch S-curved Chenille Sofa, Purchase 2pc for Combination into Tai Chi Round Sleeper Sofa Bed
1 / 30
Yin-Yang Design Single Chaise Couch S-curved Chenille Sofa, Purchase 2pc for Combination into Tai Chi Round Sleeper Sofa Bed
Sale
From $826.99
0
|Write a Review
Color:Select a color

Brown

White

Beige

Orange

Coral Pink

Light Grey
ITEM#: 46336930
Description
- Bring harmony and style into your living space with this Tai Chi inspired S-curved sofa set. Designed to embody the balance of Yin and Yang, the two pieces can be used together to form a complete circle or separately for versatile seating arrangements. Wrapped in luxurious woodgrain-textured chenille fabric, this sofa offers both exceptional softness and timeless appeal. Its compact 66.9" profile makes it ideal for apartments, offices, or cafe corners, while high-resilience foam ensures lasting comfort and support. With no assembly required and two coordinating throw pillows included, this sofa set blends elegance, comfort, and convenience effortlessly.
Product Features
- Tai Chi Inspired S-Curved Design offers a unique Yin-Yang visual and functional harmony.
- Allows flexible solo or paired use.
- Luxurious woodgrain-textured chenille fabric delivers softness and durability.
- High-resilience foam cushions retain their shape for long-lasting comfort.
- Compact 66.9" length fits small apartments, offices, and cafes.
- No assembly required — simply unpack and decompress.
- Includes two matching throw pillows for extra lumbar support and style.
Product Details
- Style: Modern Yin-Yang inspired design
- Material: Chenille upholstery with woodgrain texture
- Frame: Sturdy internal support for stability
- Cushion: High-resilience foam for balanced firmness
- Dimensions: 66.9" length (each sofa)
- Accessories: Two coordinating throw pillows included
Notice:
Manual measurement has been used, there may be some reasonable error.
Due to factors such as display equipment and shooting environment, the color of the item may be slightly different from the picture, which is a normal phenomenon, please refer to the actual item.
Please confirm whether the size meets your requirements before you buy it!
Contact US:
After-sales Email Address: layla.waitzkin@iveryfurniture.com
If the item comes with any defect, damage(include damaged in transit) or missing partsand, please contact us with detailed images for free replacement or refund.
- Pattern
- Solid
- Seat Style
- Tight Seat
- Color
- Beige, Brown, Grey, Orange, Pink, White
- Dimensions
- 66.9 In. W X 25.6 In. H X 40.2 In. D
- Material
- Fabric
- Model Number
- ROSE
- Product Features
- Chaise
- Seats Up To
- 2
- Solid
- Type
- Sofa
- Back Style
- Tight Back
- Style
- Classic, Modern & Contemporary
- Arm Style
- Recessed Arms
- Assembly
- Assembly Required
- Upholstery Material
- Chenille
- Country of Origin
- China
There are currently no customer reviews for this product.
30 Days to Initiate a ReturnYou can initiate a return for most new and unused items within 30 days of delivery for a refund.
Most New and UnusedYou must return items in new or unused condition with all original materials included with the shipment.
45 Days to Receive Returned ItemsWe must receive your returned items at our processing facility within 45 days of delivery.
Errors & DefectsIf the return is a result of our error or defective product, we will refund the full cost of the merchandise and shipping charges.
Mattress Returns (Standard)Unless otherwise specified, mattresses and mattress sets are not returnable unless defective or damaged. Please notify us of any damage/defects immediately upon receiving. For buyer’s remorse reasons, mattresses are non-returnable unless the mattress is unopened. Please see our Product-Specific Return Policies.
Shop Overstock.com and find the best online deals on everything for your home and more. We work every day to bring you the best products at the best prices, from rugs and jewelry to furniture and decor. Whether you’re looking for memorable gifts or everyday treasures, find them here for less.
Get the App
Overstock uses cookies to ensure you get the best experience on our site. To consent, please continue shopping. Learn More