Extra 10% Off Select Products
Furniture
/
Living Room Furniture
/
Living Room Seating
/
Sofas

Full Compression Sponge Loveseat, S-Curved Dual-Depth Sofa, Brown Chenille Modular for Small Spaces & Meditation

ITEM#: 46256900
  • Tai Chi Symbol Design: Curved half-circle shape mimics the Tai Chi motif; pair two sofas in different colors to create a full yin-yang pattern for decorative or spiritual spaces.
  • Ergonomic Dual Seat Depth: 30D sponge padding provides balanced support for two, with a 300 lbs weight capacity for daily use.
  • Zen-Inspired Aesthetics: Soft chenille fabric and neutral color options (Sand Beige, Light Gray) complement tai chi rooms, meditation lounges, or minimalist decors.
  • No-Assembly Convenience: Ready to use in seconds, ideal for quick setup in small apartments, modern studios, or home offices.

Disclaimers & Disclosures:

Assembly Required

Seats Up To
2
Print
Solid
Type
Sofa
Color
Brown
Style
Modern & Contemporary
Dimensions
40.2 In. W X 25.6 In. H X 66.9 In. D
Material
Wood
Model Number
XHW2231P329732
Assembly
Assembly Required
Country of Origin
China
There are currently no customer reviews for this product.
30 Days to Initiate a ReturnYou can initiate a return for most new and unused items within 30 days of delivery for a refund.
Most New and UnusedYou must return items in new or unused condition with all original materials included with the shipment.
45 Days to Receive Returned ItemsWe must receive your returned items at our processing facility within 45 days of delivery.
Errors & DefectsIf the return is a result of our error or defective product, we will refund the full cost of the merchandise and shipping charges.
Mattress Returns (Standard)Unless otherwise specified, mattresses and mattress sets are not returnable unless defective or damaged. Please notify us of any damage/defects immediately upon receiving. For buyer’s remorse reasons, mattresses are non-returnable unless the mattress is unopened. Please see our Product-Specific Return Policies.
Shop Overstock.com and find the best online deals on everything for your home and more. We work every day to bring you the best products at the best prices, from rugs and jewelry to furniture and decor. Whether you’re looking for memorable gifts or everyday treasures, find them here for less.
Get the App
Download the app from the Google Play StoreDownload the app from the Apple Store